Hardwood
  
Tile
  
Laminate
  
Stone
  
LVT
  
Area Rugs
  
Commercial
menu-requestinhomemeasure-link@@ ">
Free In-Home Consultation 
Ask a Question
  
Hardwood
  
Tile
  
Laminate
  
Stone
  
LVT
  
Area Rugs
  
Commercial
menu-brands-link@@">
 
 
         
            
    
Vinyl | Installation
        
Owning  a home is all about being prepared. Preparing your home for seasonal  changes, preparing for guests and now preparing for the arrival of new vinyl  flooring. Being ready for the installation of your new vinyl flooring will make  the entire process go faster, more efficiently, and hopefully eliminate any  surprises. 
Use a professional
  - this type of floor       is heavy, difficult work
 
  - it’s labor intensive       and extremely exacting
 
  - not for the       do-it-yourselfer
 
  - installing  vinyl flooring is a skill that is developed through years of experience
 
Subfloor preparation
  - installing over a       wood substrate, an underlayment will generally be necessary
 
  - installing over a       concrete substrate will not require an underlayment but will require some       floor preparation
 
  - pay attention to the       height of your appliances to counters and cabinets if an underlayment is       required
 
  - strongly recommended       that existing flooring be removed, to ensure a proper high quality       installation before installing new flooring
 
  - professionals       determine if your existing vinyl flooring is acceptable or if it will need       to be removed
 
Install Methods
Full Spread
  - the  adhesive is trowled over the entire substrate
 
Perimeter Adhered
  - installation  method in which adhesive is only applied to the perimeter of the flooring and  also at the seams
 
Floating
  - type  of installation in which the vinyl flooring is not bonded to the substrate by  any adhesive
 
Before installation day
  - relocate furniture
 
  - empty china cabinets       and closets 
 
  - consider removal and       disposal of old floorcovering
 
  - remove it yourself       and leave 1 day before install
 
  - moldings and       baseboards need to be removed for vinyl installation 
 
  - installers not       responsible for damage or breakage due to dry or brittle wood
 
  - painted  baseboards, woodwork and paint may need retouching (this is your  responsibility)
 
  - existing sub floor       may need to be prepared to receive the vinyl
 
Door plan 
  - possibility that       doors may not clear the new floor and swing free
 
  - installers  may remove doors and rehang for an additional cost.
 
  - for  clearance issues, arrange for a qualified carpenter to shave or cut down 
 
Clean-up
  - waste will be produced
 
  - waste collected and disposed of by installers at an  additional cost
 
Installation day
  - be home and       available
 
  - be prepared for       questions
 
  - presence insures the       right wood is installed in the right areas
 
  - exact time of       arrival cannot be guaranteed, only a time frame
 
Safety 
  - installers use tools       and techniques that can be hazardous
 
  - make sure that       children and pets are out of the work area 
 
  - follow through with       a walk- through
 
  - prior to       completion walk through to ask questions and be clear on any final details
 
After installation day
  - establish good ventilation for 48 to 72 hours